What to ask before signing off a beer system design

A sales representative writes your beer system quote. That is not a criticism. You just need to read it with questions ready.

These are the questions that separate a design that works from one that looks fine until the first hot Saturday. They work on any quote from any supplier, including ours.

For each one: the question, why it matters, and what a good answer sounds like.

Questions about cooling and distance

How far does the beer travel from the cellar to the tap, and how is it kept cold the whole way? Why it matters: Distance is the biggest single driver of how a system needs to be cooled. A method that suits a short run can struggle over a long one. A good answer: A measured run, a named cooling method such as ice bank, glycol or direct draw, and a plain reason that method suits your distance. Not “it will be fine”.

Will it hold temperature on the hottest afternoon of the year with the bar full? Why it matters: A system has to be designed for its worst day, not its average one. A Perth cellar in February is a different environment from the same cellar in July. A good answer: The supplier has asked you about cellar conditions and your busiest trading, and can explain how the cooling was sized against both.

Questions about capacity and future taps

Is the tap count based on our peak trade or our average? Why it matters: A system sized for a quiet night will fail on a busy one. If you are not sure the count is right, work out how many beer taps your venue actually needs before you approve anything. A good answer: A tap count that comes from your menu, your peak throughput and your bar layout, with the reasoning written down.

Can we add taps later without replacing the cooling? Why it matters: Menus grow. If the cooling has no headroom, adding two taps in three years can mean replacing far more than two taps. A good answer: A clear statement of how many more taps the system could take, and what would need to change beyond that. If the honest answer is none, a good supplier says so.

Questions about maintenance access

Can a technician reach every part of the system without pulling the bar apart? Why it matters: Every system needs servicing. If the couplers, lines or cooling are hard to reach, every service takes longer and every fault takes longer to find. A good answer: Access has been planned into the layout, and the supplier can show you where a technician will stand to work on each part.

Who can service this system, and will they come to us? Why it matters: The installer and the service provider are not always the same business. For regional venues, the real question is whether anyone will travel. A good answer: A named service arrangement, clear after-hours availability, and a straight answer about coverage for your location. Also ask whether other technicians can work on it, or whether it only suits one supplier.

Questions about failure mid-service

If something fails on a Saturday night, what keeps pouring? Why it matters: Some components serve every tap. Some serve one. Knowing which is which tells you whether a fault costs you one beer or the whole bar. A good answer: A clear explanation of what is shared across the system and what is independent, and what the design does to limit a single fault.

What happens when we call for help after hours? Why it matters: Faults do not keep business hours, and the busiest nights are when a system is most likely to be pushed past its limits. A good answer: Who you call, when they are available, and whether after-hours support is included or arranged separately.

Questions about inclusions

What exactly is in this quote, and what is not? Why it matters: Two quotes for the same number of taps can describe very different jobs. The gaps usually show up after the work has started. A good answer: An itemised scope covering commercial beer taps, lines, couplers, cooling, gas equipment, installation, commissioning and removal of any old system. Anything excluded should be stated plainly.

Does it include CO2 monitoring for the cellar? Why it matters: Cellar gas monitoring is covered by AS5034, and a new install should meet the standard from day one rather than be retrofitted later. A good answer: A clear yes or no, and if yes, who installs and calibrates it.

Does it include training for our staff on the new beer dispensing equipment? Why it matters: A new system poured badly wastes beer from its first night. A good answer: A handover or training session before opening, with what it covers spelled out.

What warranty applies, and what would void it? Why it matters: A warranty you void by doing the wrong thing in the cellar is not much of a warranty. A good answer: What is covered, for how long, and the specific things your staff should not touch.

Put these questions to our team first

Barons designs, installs and services commercial beer systems for venues across WA from a base in Canning Vale, with 24-hour on-call support. If you are planning a new beer system, put these questions to us first.

Equipment Enquiry